Syber weigh system’s weighbridge is constructed entirely of steel and is lighter and easier to shift. The civil foundation required is very minimal and can be done in about 2 days’ time. The weighbridge itself can be installed in a few Hours. Standard weighbridge foundation and installation takes 1-2 months whereas a mobile weighbridge can be installed in 1-2 days. This weighbridge is most suitable for temporary sites such as construction sites and chemical industries. This mobile weighbridge can be shifted to another site easily. The modular design helps in easy cost affective transportation and reinstallation.
Features:-
May be easily transported and relocated due to modular design.
The weighbridge can be installed within 4-5 hours.